Kitchen 80%

More work today on the kitchen area.  I had run power for a 12vdc power point on the end of the cabinet.  So I went ahead and installed that first thing today.  Should come in handy.

pict0045a.jpg

Next task before putting the counter top in place was to put the cabinet shelf back in place.

pict0046b.jpg

I decided to fit the sink in place before mounting the counter top and avoid having to stand on my head tighening the bolts ;-)  I also fitted the new drains and put on stainless hoses on the faucet.

pict0047c.jpg

With a big heav-hoe and a lot of muttering, the counter top is fitted in place with the sink and faucet already mounted.

pict0049e.jpg

Next I fitted the cook top in place and screwed it down.  I started running out of time so I’ll have to finish the gas fitting next time and connect up the sink hoses to the supply lines.

pict0048d.jpg

There is still a lot of triming out to do with the alumium trim yet to be fitted, but it was a good days work.  Although I never acomplish as much as I expect to.  Such is the nature of the job.

One last shot of the kitchen.

pict0052h.jpg

More to follow….

Facebooktwitterredditpinterestlinkedinmailby feather

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.